St. Elizabeth Health Center, New Hospital
Boardman, Ohio
Construction Cost: $59,000,000
This project consisted of a new 210,000 sq. ft., 7-story Hospital addition to the existing Diagnostics Building. New areas include 128 general medical surgical beds, 12 ICU beds and five surgical suites, Central Sterile, Endoscopy, Physical Medicine and Rehabilitation, Pharmacies, Lab Areas, and a second floor Kitchen and Dining area open to an Atrium at the new Main Entry Lobby.
Scheeser Buckley Mayfield provided HVAC, plumbing, fire protection and electrical design for the hospital.
Top Of Page
|